Vedanta aims to set up a Gen 8.6 LCD fab in late 2023 and start mass production in 2026, in partnership with Innolux. Vedanta aims to ramp up the fab’s capacity to 240,000 sheets per month as part of India’s first electronics manufacturing cluster.

A subscription is required to view this content.

Already subscribed? Continue Continue